Spot the initial plank Together with the tongue aspect going through the wall. Press the end seam of the second plank into the end seam of the first plank, and then lock them together by laying the plank down. Go on Doing the job remaining to suitable. SPC flooring is https://www.trioflor.net/rigid-core-spc/